Initially KIW was taken over the plant from Kalinga Industries Ltd. On 01.04.1963 with one furnace having capacity of 30,000 M.T. of pig iron per annum. Subsequently three more furnace have been installed and the initial furnace No.1 has been modernized during 1999 increasing it’s production from 90MT to 170 MT/day with volume increase to 100 M3.During the year1998 with the help of MECON the stack height increase was done to furnace No IV by increasing it’s production from 72 M3 to 85 M3.subsiquently similar stack height increase was done to furnace No.II in the year of 2003-04 and furnace No-III in the year of 2002-03.
The date of commissioning and installed capacity of furnace are as under :

 
Date Of Commissioning
Installed Capacity (per annum)
Furnace No.I :
05.10.1999
60,000 MT (After Modernization)
Furnace No.II :
01.04.1969
40,000 MT
Furnace No.III :
01.02.1971
40,000 MT
Furnace No.IV :
29.03.1991
40,000 MT

.

                                    Total:180000 MT

 
The company has Captive power plant with four unit of T.G. Sets having 4 MW capacity each, total 16 MW by utilizing B.F. Gas.
 
The date of installation and addition of capacity is as under :

4 MW Capacity 11.05.1968
8 MW Capacity 23.11.1968
4 MW Capacity 13.05.1996
Total: 16 MW capacity

Spun Pipe Division was commissioned during March,1982 with capacity of 31,200 M.T(3 Shift operation ). The actual achievable capacity in two shift operation is 21,000 MT per annum.It has five nos of spinning machine producing various size s of C.I pipes ranging from 80 mm to 400 mm dia.This division has three nos. of induction furnace having 3.5 MT capacity each and one holding Furnace having 18 MT capacity.

The company has achieved highest production of 1,47,456 MT hot Metal during 2006=07 and monthly highest production of 14,249 MT(HM) during August 2001.Spun Pipe Division has achieved  highest production of  20616 MT during  1997-98 and highest monthly production  of 2228 MT during  November 1998.The year of highest sale of Spun Pipe is 1999-2000 – 22255 MT. The year wise production, Sale , Turnover and profit/loss both for PID and SPD separately enclosed.

                               

Presently the capital investment (Gross Fixed Assets) as on 31.03.2007 for both PID and SPD is RS 106.30 crore. Total numbers of regular employee are 1179 as on 30.09.2007 including 83 nos deployed at corporate office. Besides, there are 1034 nos. of Supply/Contract laborers working in the plant regularly.

 